Skip to content
All notes
PreconstructionSeptember 202415 min read

Measurement and Surveys for Offshore Wind Farm

Survey costs represent 1-3% of project CAPEX but drive 30-40% of total cost through design decisions. A PM's breakdown of wind measurement, metocean, geophysical, and geotechnical campaigns — with real cost data.

Duc Hoang, PMP

Loading article…