Energy project delivery

Mostly preconstruction, constructability, contracts, packages, cost and schedule—written from the questions that come up while doing the work.

Showing 25 project notes

All project notes

25
PreconstructionInteractive evidence gate
August 202611 min read + evidence gate

The question

What decision does the available ground evidence actually support?
ConstructabilityInteractive screen
August 20264 min read + interactive screen

The question

Can the delivery vehicle use the route shown on the drawing?
PreconstructionInteractive programme
August 202610 min read

The question

Which enabling condition must become a controlled programme gate?
Contracts & PackagesOne-page decision sheet
August 20266 min read

The question

Does the owner have the capability to retain the material interface?
Cost & ScheduleField note
March 202618 min read

The question

Time management starts on the drawing board — not when you open Primavera. How sequential vs parallel design predetermines your schedule's resilience, with real examples from solar farms and wind projects. Based on the CIOB Guide to Good Practice.

The question

It costs $0.124/Wp to make a solar panel in Vietnam using Chinese cells. It costs $0.284/Wp to make the same panel in Germany. An interactive deep-dive into IRENA's 2026 supply chain cost data — polysilicon to module, 6 countries, 4 import scenarios.
Solar + BESSField note
March 202610 min read

The question

The most important technology in energy isn't solar — it's what happens when the sun goes down. A PM's breakdown of how battery storage is reshaping the grid, from the duck curve to virtual power plants.

The question

Over 2,600 GW of clean energy projects are stuck in US interconnection queues — more than double current installed capacity. A PM's guide to navigating the biggest bottleneck in the energy transition.

The question

A field engineer's honest take on how digital twins are transforming energy infrastructure. From solar farms to BESS to offshore wind -- what works, what doesn't, and why every PM should care.
Solar + BESSField note
February 202610 min read

The question

Solar at $35/MWh. Batteries down 45% in one year. A PM's honest comparison of solar+BESS vs nuclear, onshore wind, and offshore wind -- with real numbers from Lazard, BloombergNEF, and the IEA.
Wind + FPVField note
September 202512 min read

The question

Explore the complete offshore wind farm ecosystem through an interactive visualization. From floating turbines in deep waters to grid connections on shore, discover how these engineering marvels harness ocean winds to generate clean electricity.
Contracts & PackagesField note
August 202525 min read

The question

A detailed and interactive guide to integrating Free Issue Material (FIM) strategy for optimal procurement in renewable energy projects, covering workshops, procurement structure, team organization, and business case.
PreconstructionField note
August 202510 min read

The question

Where do I even start? The most common question from our first RE workshop. Technology deep dives, Vietnam market context, career implications, and 5 things I wish I'd known before my first project.
Cost & ScheduleField note
December 202415 min read

The question

An interactive analysis of the latest cost trends in renewable energy technologies based on IRENA's comprehensive 2024 report. Explore how Solar PV achieved 90% cost reduction, making it one of the most competitive renewable technologies.
Cost & ScheduleField note
December 202417 min read

The question

The most expensive estimate isn't the highest one — it's the lowest one that turns out to be wrong. A PM's guide to estimation methods, cost components, and the mistakes that blow budgets in renewable energy.
Cost & ScheduleField note
December 202411 min read

The question

A detailed work breakdown structure (WBS) for offshore wind farm projects, covering every phase from development through commissioning and operations.

The question

Three types of RE developers — the overextended, the over-analytical, and the disciplined. A PM's complete playbook with PESTEL analysis, LCOE benchmarks, financing strategy, and adaptive management.
ConstructabilityField note
November 202415 min read

The question

Nearshore wind construction is a logistics war fought against tides, weather, and bureaucracy. Hard-won lessons from Vietnam's 4.6 GW wind rush — from barge problems to commissioning stakeholder management.
Contracts & PackagesField note
November 202414 min read

The question

The biggest risk in multi-package offshore wind isn't technical — it's organizational. A PM's guide to RACI matrices, interface management, and the coordination failures that kill projects.
PreconstructionField note
October 202418 min read

The question

11 risk categories that kill offshore wind projects — with quantified examples, probability-impact matrices, and the PM lessons from projects that got risk management right and wrong.
PreconstructionField note
September 202415 min read

The question

Survey costs represent 1-3% of project CAPEX but drive 30-40% of total cost through design decisions. A PM's breakdown of wind measurement, metocean, geophysical, and geotechnical campaigns — with real cost data.

The question

The most comprehensive guide to offshore wind farm development. Covers every phase from site selection and environmental assessment through construction, commissioning, and long-term operations.
Contracts & PackagesField note
August 202416 min read

The question

EPC vs multi-package: the most consequential decision after site selection. A PM's comparison of 4 contract structures with FIDIC deep-dive, cost benchmarks, and real-world lessons from interface failures.
ConstructabilityField note
August 202414 min read

The question

When a 70-meter blade meets a village road corner — the underestimated risk that controls wind project schedules. Real cost data, route planning lessons, and the PM's playbook for Vietnam.

The question

Why pile cap beats monopile in Vietnam's Mekong Delta. A site-specific analysis of foundation selection with real soil data, cost comparisons, and lessons from the field.